OECP Practice Test

25 mobile crane questions on setup, operations, power lines, inspections and the OSHA and ASME rules behind them. Pick an answer to see if you are right and why. Your score is at the bottom.

Practice by exam

25 OECP practice questions

Original practice questions from the Crane Exam Prep question bank. They are not actual OECP exam questions.

  1. Site Setup

    1. The area that must be barricaded around an operating crane is…

    Show answer

    Answer: C. The swing radius of the rotating superstructure's rear. The rotating rear can crush a worker — barricade its swing radius.

  2. Operations

    2. As more layers of rope wind onto the drum, available line pull…

    Show answer

    Answer: B. Decreases. Each layer increases the effective drum diameter, reducing line pull.

  3. Power Lines

    3. How many electrocution hazard warnings must be posted on a crane?

    Show answer

    Answer: B. At least one in the cab and at least two on the outside. At least one electrocution hazard warning must be conspicuously posted in the cab in view of the operator, plus at least two on the outside of the equipment.

  4. Operation Aids

    4. For hoisting personnel, what type of anti-two-block protection is acceptable?

    Show answer

    Answer: D. A prevention system — two-block warning-only devices are not allowed. Personnel hoisting requires an anti-two-block device that prevents two-blocking; warning-only devices are not permitted.

  5. Mobile Crane Essentials

    5. On lattice boom cranes, what does the boom hoist limit switch do?

    Show answer

    Answer: D. Automatically stops the boom from hoisting at maximum boom angle. The boom hoist limit switch automatically stops the boom from hoisting up at maximum boom angle on lattice boom cranes.

  6. Inspections

    6. During the shift inspection, how should the calibration of safety devices and operator aids be verified?

    Show answer

    Answer: A. By using actual measurement. The shift inspection checks installation and calibration of safety devices and operator aids using actual measurement.

  7. OSHA 1926 Subpart CC

    7. According to OSHA 1926.1431, all welding of the personnel platform and its components must be performed by:

    Show answer

    Answer: A. A certified welder familiar with the weld grades, types and material specified in the platform design. 1926.1431(e)(5) requires a certified welder familiar with the weld grades, types, and materials specified in the platform design.

  8. ASME B30.5 (Mobile Cranes)

    8. Under ASME B30.5, what are "operational aids"?

    Show answer

    Answer: C. Devices such as anti-two-block systems and load moment indicators that assist the operator but do not replace operating judgment. B30.5 treats devices like anti-two-block, LMI/RCL, and boom angle indicators as operational aids, with specified actions when they are inoperative.

  9. Crane Types

    9. For a land crane operating on a barge, the maximum allowable list or trim can never exceed:

    Show answer

    Answer: C. 5 degrees. List and trim must not exceed the least of 5 degrees, the amount the crane manufacturer specifies, or the amount a qualified person specifies.

  10. Technical Knowledge

    10. A crane manufacturer never responds to a written request to approve a modification. When may a registered professional engineer approve it instead?

    Show answer

    Answer: B. If the manufacturer fails to start review within 30 days or finish within 120 days. If the manufacturer no longer exists, does not acknowledge the request, fails to start review in 30 days, or fails to finish within 120 days, an RPE may approve the modification.

  11. General Knowledge

    11. Which factor is the most important to consider about site access?

    Show answer

    Answer: B. compaction of approach roads. Approach roads must be adequately compacted to support the crane traveling to the setup location.

  12. Definitions

    12. A boom hoist limiting device works by…

    Show answer

    Answer: D. Disengaging boom hoist power when the boom reaches a predetermined angle and holding it from lowering. The device disengages boom hoist power at a predetermined operating angle and sets brakes or closes valves so the boom cannot lower once power is disengaged.

  13. Standards

    13. EM 385-1-1, which appears in the standards list applicable to cranes and lifting, is issued by whom?

    Show answer

    Answer: B. The U.S. Army Corps of Engineers. EM 385-1-1 is the U.S. Army Corps of Engineers general safety requirements manual, and it governs work on Corps projects — often with requirements stricter than OSHA.

  14. Operations

    14. Side loading a telescopic boom by dragging a load sideways is:

    Show answer

    Answer: C. prohibited, because booms are designed for vertical loads. Booms are engineered for vertical loading; side loads can buckle the boom and are prohibited.

  15. Power Lines

    15. Option 1 for power line safety under OSHA 1926.1407-1411 is to have the lines…

    Show answer

    Answer: A. De-energized and visibly grounded at the worksite. Option 1 is to de-energize AND ground the lines visibly at the worksite; Options 2 and 3 rely on clearance distances plus additional protective measures.

  16. Operation Aids

    16. How is the calibration of a boom ANGLE indicator verified?

    Show answer

    Answer: A. By measuring the boom angle with a protractor or digital level. A boom angle indicator is checked with a protractor or digital level; a radius indicator is checked by taping the radius.

  17. Mobile Crane Essentials

    17. What problems does eccentric reeving cause?

    Show answer

    Answer: C. Torsion on the boom and excessive wear to components. Eccentric reeving causes torsion on the boom and excessive wear to components.

  18. OSHA 1926 Subpart CC

    18. According to OSHA 1926.1408, which of the following is an acceptable encroachment prevention measure under Option 2 or Option 3?

    Show answer

    Answer: D. An insulating link/device installed at a point between the end of the load line (or below) and the load. 1926.1408(b)(4) lists a proximity alarm, dedicated spotter, range control warning device, range-limiting device, or an insulating link/device between the load line and load.

  19. ASME B30.5 (Mobile Cranes)

    19. According to ASME B30.5, the operator shall test the brakes each time a load approaching the rated load is handled by:

    Show answer

    Answer: B. Lifting it a few inches and applying the brakes. Para 5-3.2.1.5(g) requires testing the brakes by raising the near-rated load a few inches and applying the brakes.

  20. Wire Rope

    20. In the wire rope designation "6 x 25 Filler", what do the numbers mean?

    Show answer

    Answer: C. 6 strands in the rope, 25 wires in each strand. The first numeral is the number of strands (6); the second is the number of wires in each strand (25); Filler is the wire pattern.

  21. Crane Types

    21. The 'swing cab' designation means that:

    Show answer

    Answer: B. the operator's cab rotates with the boom on the rotating superstructure. On a swing (rotating) cab crane the operator's station is mounted on the upperworks and rotates together with the boom, unlike a fixed-cab carrier station.

  22. Site Setup

    22. A project has no controlling entity. Who must ensure the needed ground preparations are provided?

    Show answer

    Answer: A. The employer that has authority at the site to make or arrange them. If there is no controlling entity, the ground-preparation duty falls to the employer with authority at the site to make or arrange those preparations.

  23. Site Setup

    23. ANSI/ASME expresses crane out-of-level as a percentage of grade. A 1% grade equals what?

    Show answer

    Answer: B. A drop of 1 ft over 100 ft of horizontal length (12 in. over 1,200 in.). Percentage of grade is a ratio of drop to horizontal run. Most standards allow a maximum of 1% out of level, though some cranes must be within 1/2% to hold their chart numbers.

  24. Site Setup

    24. Most standards allow a crane to operate up to 1% out of level, but some crane types must be within what tolerance to meet their load chart?

    Show answer

    Answer: A. 1/2 of 1 percent of grade. One percent is the general limit, but the manufacturer's criteria always govern, and some machines are rated only within one half of one percent of level.

  25. Operations

    25. A "tag line" is:

    Show answer

    Answer: A. A rope attached to the load and handled by ground personnel to control the load's rotation and swing. Tag lines give riggers control of a suspended load's orientation without placing hands on the load, helping prevent uncontrolled spinning or swinging.

The real exam

How the OECP written exam works

OECP is open only to IUOE members in good standing. You pass a written exam first, then a hands-on practical for each crane type you want on your card. The card is good for five years.

OECP does not supply study material or run training. It points candidates to their local's training site and to the references listed in the candidate manual.

Full OECP certification guide on Crane Exam Prep
OECP written exams
Mobile, tower and overhead75 multiple-choice questions each, 2 hours
Signal Person Rigger110 multiple-choice questions, 2 hours
Passing scoreScaled score of 500 on a 200 to 800 scale
CalculatorsNot allowed
Recertification50 questions for each crane type, every 5 years

Sources: OECP Crane Operator Candidate Manual, OECP Signal Person Rigger Candidate Manual and OECP FAQ. Checked November 2026.

FAQ

About this practice test

Is this OECP practice test free?
Yes. All 25 questions and their answers are on this page, with no sign-up. The full question bank is in the Crane Exam Prep app, which has a free tier.
How many questions are on the real OECP written exam?
The mobile, tower and overhead crane written exams each have 75 multiple-choice questions and a two-hour limit. The Signal Person Rigger written has 110 questions.
What score passes the OECP written exam?
OECP reports scores on a 200 to 800 scale and 500 passes. It does not publish a percent-correct pass mark, so use practice scores to find weak topics, not to predict a result.
Can I use a calculator on the OECP exam?
No. Calculators are not allowed. Practice the load math by hand.
Are these the real OECP exam questions?
No. OECP does not release its questions and does not supply study material. These are original practice questions written from the OSHA crane rules and ASME B30 standards. This site is not affiliated with OECP or the IUOE.