OECP Mobile Crane Practice Test

The OECP mobile crane written is one exam for three crane types: boom truck, lattice boom and telescopic boom. It has 75 multiple-choice questions, a two-hour limit and no calculators. Work through 20 free questions below and check each answer as you go.

What the written covers

  • Current regulations
  • Jobsite conditions
  • Crane setup
  • Safe operation
  • Maintenance
  • Rigging
  • Load chart calculations

Which crane types one mobile written covers

Passing the mobile crane written opens the practical for any of the three mobile types. OECP sorts telescopic boom cranes by size: small is under 22 tons (boom trucks are their own type), medium is 22 to 75 tons, and large is over 75 tons. You take a separate practical for each crane type you want on your card.

OECP mobile crane written exam at a glance
Questions75 multiple choice
Time limit2 hours
Passing scoreScaled score of 500 on a 200 to 800 scale
Crane types coveredBoom truck, lattice boom and telescopic boom
CalculatorsNot allowed
Handed to youTest booklet, load charts, pencils and scratch paper
ResultsPass or fail on the spot for computer-based tests. Paper tests are mailed within 10 working days
After you passA hands-on practical exam for each crane type

Sources: OECP Crane Operator Candidate Manual and OECP FAQ. Checked November 2026.

20 mobile crane practice questions

Pick an answer to see if you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual OECP exam questions.

  1. Mobile Crane Essentials

    1. How are hoist brakes checked before a critical lift?

    Show answer

    Answer: D. Raise the load a few inches off the ground and hold it. Hoist brakes are checked by raising the load a few inches off the ground and holding it to verify the brake holds.

  2. Site Setup

    2. Equal outrigger extension is impossible at your setup. If the manufacturer publishes a chart for your shortest span, you may…

    Show answer

    Answer: C. Use that shorter-span chart, treated as manufacturer permission. If equal positioning is impossible, consult the manufacturer; a supplied shortest-span chart (e.g., the 50% chart) may be used as manufacturer permission.

  3. Operations

    3. According to O.S.H.A., the operator shall not hoist loads above?

    Show answer

    Answer: A. personnel. OSHA prohibits carrying loads over people; a dropped load over personnel is the most serious crane hazard, so loads must be routed around workers.

  4. Power Lines

    4. Overhead AC electrical transmission lines all share what characteristic?

    Show answer

    Answer: B. They carry 3-phase current. AC transmission lines carry 3-phase current, which is why their conductors are arranged in threes.

  5. Operation Aids

    5. The load moment indicator (LMI/RCL) is classified as which category of operational aid?

    Show answer

    Answer: C. Category II. The LMI/RCL is a Category II operational aid — 30-day repair window. Trap: it is not Category I like the anti-two-block, and not a 'safety device' like the horn.

  6. OSHA 1926 Subpart CC

    6. According to OSHA 1926.1406, when using employer procedures instead of manufacturer procedures for assembly/disassembly, the procedures must be developed by:

    Show answer

    Answer: D. A qualified person. 1926.1406(b) requires employer A/D procedures to be developed by a qualified person, and they must prevent unintended dangerous movement and collapse.

  7. ASME B30.5 (Mobile Cranes)

    7. According to ASME B30.5, the specified operating clearance for power lines over 200 kV to 350 kV is:

    Show answer

    Answer: C. 20 ft (6.1 m). Table 5-3.4.5.1-1 specifies 20 ft (6.1 m) for over 200 kV to 350 kV; over 350 to 500 kV requires 25 ft, over 500 to 750 kV requires 35 ft, and over 750 to 1,000 kV requires 45 ft.

  8. Inspections

    8. Manufacturer inspection intervals are based on…

    Show answer

    Answer: D. Days, months, and actual operating hours. Unlike OSHA's calendar-based scheme, manufacturers set intervals by days, months, and actual operating hours.

  9. Swing Cab — General

    9. The 'no-load stability limit' printed on the chart identifies the radius beyond which:

    Show answer

    Answer: C. the boom may not be positioned even with nothing on the hook. Beyond the no-load stability limit, positioning the boom plus load-handling equipment is prohibited because the crane can overturn without any load.

  10. Technical Knowledge

    10. A sudden lift or a sudden stop (impact loading) can typically increase the force on a crane by how much?

    Show answer

    Answer: A. Up to 30 percent or more, with extreme impact reaching 100 percent or more. Impact converts the load's momentum into extra force on the boom and ropes. Ordinary jerking commonly adds 30 percent or more; severe snatching or a sudden release can double the effective load.

  11. Mobile Crane Essentials

    11. What is the minimum number of wraps of wire rope that must remain on a hoist drum, unless the manufacturer specifies more?

    Show answer

    Answer: A. 2. The minimum wraps allowed on a hoist drum is 2 unless the manufacturer specifies more.

  12. Site Setup

    12. Setup ground must be firm, graded, and drained — but the drainage requirement does NOT apply to…

    Show answer

    Answer: A. Marshes and wetlands. The requirement that the ground be drained does not apply to marshes and wetlands, where marsh buggies or similar supports are used.

  13. Operations

    13. The hook used to suspend a personnel platform must have what feature?

    Show answer

    Answer: D. A lockable safety latch. Man basket service requires a hook with a lockable safety latch so the connection cannot accidentally release.

  14. Power Lines

    14. Under employer Option 1 for power line safety, deenergizing the line must be confirmed how?

    Show answer

    Answer: B. By the utility owner/operator, with the line visibly grounded at the worksite. Option 1 requires confirmation from the utility owner/operator that the line is deenergized and visibly grounded at the worksite.

  15. Operation Aids

    15. A boom LENGTH indicator is required on telescopic boom equipment except when…

    Show answer

    Answer: D. The rated capacity is independent of the boom length. The boom length indicator requirement is waived where rated capacity does not depend on boom length.

  16. OSHA 1926 Subpart CC

    16. According to OSHA 1926.1417, on wheel-mounted equipment, loads must not be lifted over the front area except:

    Show answer

    Answer: C. As permitted by the manufacturer. 1926.1417(r) prohibits lifting loads over the front area of wheel-mounted equipment except as permitted by the manufacturer.

  17. Inspections

    17. Under 1910.180, checking functional operating mechanisms for maladjustment and inspecting air and hydraulic systems for leaks are part of the…

    Show answer

    Answer: C. Frequent inspection. Maladjusted mechanisms and air/hydraulic leakage are frequent-inspection items under 1910.180(d)(2).

  18. Mobile Crane Essentials

    18. What is the preferred minimum sling angle?

    Show answer

    Answer: B. 60 degrees or higher. The preferred sling angle is 60 degrees or higher; lower angles put more stress on the sling.

  19. Site Setup

    19. Unless the manufacturer specifies otherwise, a crane must be set up level within what tolerance?

    Show answer

    Answer: C. 1% (about 0.57 degrees). The pre-shift check requires the crane to be within 1%, or roughly 0.57 degrees, of level before each shift and after each move.

  20. Operations

    20. What is the correct way to stop a swing motion on a crane with lever-operated swing?

    Show answer

    Answer: C. Bring the lever back to neutral and then apply the swing brake and lock. Driving the swing in reverse to stop it slams the swing drive and whips the load, side loading the boom. The lever is returned to neutral, motion is allowed to settle, then the mechanical brake and positive lock are set.

FAQ

Common questions

How many questions are on the OECP mobile crane written exam?
The mobile crane written has 75 multiple-choice questions and a two-hour time limit. Scores are reported on a 200 to 800 scale and 500 passes.
Does one written exam cover boom truck, lattice and telescopic cranes?
Yes. Boom truck, lattice boom and telescopic boom candidates all take the mobile crane written. The practical exam is separate for each crane type.
Can I use a calculator?
No. Calculators and other devices with memory are not allowed. You get load charts, pencils and scratch paper, so practice the math by hand.
What is on the practical exam?
OECP describes it as placing a test weight on targets, controlling swing and drift, making lifts through an obstacle course and following hand signals. You take it after you pass the written.
Are these the real OECP exam questions?
No. OECP does not release its questions and does not supply study material. These are original practice questions written from the OSHA crane rules and ASME B30 standards. This site is not affiliated with OECP or the IUOE.

More OECP practice tests

Keep studying in the full app.

5,000+ questions, lessons and a readiness score. Free to start.

Create a free account
More mobile crane questionsFree account, no card
Open the app