25 questions
OECP practice test
The mixed mobile crane test.
Take the 25-question testFree, no sign-up
OECP certifies overhead crane operators with a separate written exam: 75 multiple-choice questions in two hours, followed by a practical. Try 20 free overhead crane questions below.
| Questions | 75 multiple choice |
|---|---|
| Time limit | 2 hours |
| Passing score | Scaled score of 500 on a 200 to 800 scale |
| Experience needed | 1,000 documented hours of crane-related experience or training in the past five years |
| Calculators | Not allowed |
| After you pass | A hands-on overhead crane practical exam |
Sources: OECP Crane Operator Candidate Manual, OECP initial certification eligibility and OECP FAQ. Checked November 2026.
Pick an answer to see if you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual OECP exam questions.
Answer: D. pendant. Floor-operated cranes are controlled from a pendant station suspended from the crane, allowing the operator to control all motions from the floor.
Answer: D. The tension in the parts shall be equalized. If a load is supported by more than one part of rope, the tension in the parts shall be equalized.
Answer: A. The design factor used to establish static stress limits. The design category is the lifter classification that specifies the design factor used to establish static stress limits; the service class establishes the allowable stress range for the specified fatigue life (load cycles).
Answer: B. Place the controllers in the OFF position and keep them there until power is again available. On power loss, controllers go to OFF and stay there until power returns; similarly, before closing main or emergency switches, all controllers must be in OFF so the crane cannot start unexpectedly.
Answer: D. Give a visible and audible alarm to the crane operator at a predetermined wind speed. The wind speed indicating device shall be mounted on the crane or runway structure and give a visible and audible alarm to the operator at a predetermined wind speed; one device may serve more than one crane.
Answer: C. NFPA 70, National Electrical Code. External power supply and electrical equipment for below-the-hook lifters shall comply with NFPA 70 (National Electrical Code), and wiring shall be in accordance with ASME BTH-1.
Answer: A. Span usually over 150 ft and lift over 50 ft. Outdoor storage gantries are long span (usually over 150 ft) and high lift (over 50 ft), used for storing bulk material such as ore, coal, limestone, or sand.
Answer: B. 70 lb (310 N). Foot-operated brakes shall require an applied force of not more than 70 lb (310 N) to develop rated brake torque, and pedals shall be constructed so the operator's foot will not readily slip off.
Answer: D. Date of the last periodic inspection. Required markings include manufacturer's name and contact information, serial number, lifter weight if over 100 lb, cold current and rated voltage when applicable, rated load, and BTH-1 Design Category and Service Class — not inspection dates.
Answer: B. A power failure to the magnet or vacuum device can result in dropping the load. Loads held magnetically could drop, and power failure to magnets or vacuum devices drops the load — so never carry loads or empty bottom blocks over personnel, with extra precaution around molten metal.
Answer: D. Service Class. The correct answer is Service Class — it governs fatigue life in load cycles. The trap is Design Category, which specifies the design factor for STATIC stress limits; the Category/Class pair is a purpose-built confusion.
Answer: C. Coal, refuse, cement, and fertilizer. The bucket crane is captioned for handling coal, refuse, cement, fertilizer and similar bulk materials.
Answer: D. The maximum load designated by the manufacturer for which a crane or individual hoist is designed and built. Rated load is the maximum load designated by the manufacturer for which the crane or hoist is designed and built.
Answer: D. A minimum lifting force is necessary to actuate the clamping action; minimum loads depend on clamp wear and material hardness. The instruction manual shall define the minimum lifting force necessary to actuate the clamping action; minimum loads for pressure-gripping lifting and structural shape clamps are dependent on clamp wear and material hardness.
Answer: B. Span is center-to-center of the runway rails; gauge is center-to-center of the bridge rails. Span is the horizontal distance center to center of the runway rails; gauge is the horizontal distance center to center of the bridge rails.
Answer: C. Kinking, crushing, birdcaging, or any other damage resulting in distortion of the rope structure, and apparent heat damage from any heat source. Removal criteria include kinking, crushing, birdcaging or other distortion of the rope structure, and apparent heat damage from any heat source.
Answer: D. In such a manner as to avoid endangering hands or other body parts as the load is moved, or if it drops. Loads shall be guided in such a manner as to avoid endangering hands or other body parts as the load is moved, or if it drops; the operator shall not ride or allow others to ride loads or the lifting device.
Answer: C. 3 inches overhead and 2 inches lateral. OSHA requires a minimum clearance of 3 inches overhead and 2 inches laterally between the crane and the nearest obstruction.
Answer: A. Ensuring the weight of the load and its approximate center of gravity have been obtained, provided, or calculated. Rigger responsibilities include ensuring load weight and approximate center of gravity are obtained, selecting and inspecting proper rigging per the applicable ASME volumes (B30.9, B30.10, B30.20, B30.26), ensuring rated load sufficiency, proper attachment, balance, tag lines when needed, and hook latch use.
Answer: D. during the first lift. The hoist brake is tested during the first lift by raising the load a few inches and verifying the brake holds it — a functional test under actual load conditions.
Your result
FAQ
25 questions
The mixed mobile crane test.
Take the 25-question test75 questions
One written exam for boom truck, lattice boom and telescopic boom.
Mobile crane practice test75 questions
Its own written exam, including self-erecting tower cranes.
Tower crane practice test110 questions
One OECP certification for signaling and rigging together.
Signal person rigger practice test5,000+ questions, lessons and a readiness score. Free to start.