25 questions
OECP practice test
The mixed mobile crane test.
Take the 25-question testFree, no sign-up
OECP combines signaling and rigging in one certification. The written exam has 110 multiple-choice questions in two hours, and 40% of it is signaling. The 20 free questions below follow the same split: 8 on signals and 12 on rigging.
| Questions | 110 multiple choice |
|---|---|
| Time limit | 2 hours |
| Passing score | Scaled score of 500 on a 200 to 800 scale |
| Rigging standards | 20% of the questions |
| Rigging operations | 30% of the questions |
| Rigging calculations | 10% of the questions |
| Signaling | 40% of the questions |
| Practical exam | Four tests: hand signals, radio signals, rigging inspection and a rigging practical |
| Experience needed | 500 hours of experience or training in Operating Engineer work in the past five years, plus a certificate from an IUOE-recognized signal person rigging training program |
| Card life | 5 years |
Source: OECP Signal Person Rigger Candidate Manual (2025 edition). Checked November 2026.
Pick an answer to see if you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual OECP exam questions.
Answer: C. Pause and hold — the operator stops all crane motions and holds the load and machine functions where they are. DOG EVERYTHING (hands clasped in front of the body) tells the operator to suspend all functions and hold everything in place until further signals are given.
Answer: C. See the load and point of operation and be clearly seen by the operator. The signal person must keep a clear view of the load/point of operation and stay visible to the operator; standing under the load is prohibited.
Answer: C. A hands-free system. 1926.1420(c) requires the operator's reception of signals to be by a hands-free system, and devices must be tested on site before operations begin.
Answer: B. Three short audible signals. Para 5-3.3.7 specifies STOP: one short signal; GO AHEAD: two short signals; BACK UP: three short signals.
Answer: D. Function and direction. Voice signals are given in the order: function and direction first, then distance/speed, then function stop.
Answer: B. Posted on the equipment or conspicuously posted in the vicinity of the hoisting operations. 1926.1422 requires hand signal charts to be either posted on the equipment or conspicuously posted in the vicinity of hoisting operations.
Answer: D. The Standard Method in Appendix A of Subpart CC, unless infeasible or the operation is not covered by it. 1926.1419(c)(1) requires the Standard Method (Appendix A) for hand signals; non-standard signals may be used only where the Standard Method is infeasible or does not cover the operation, with prior agreement among signal person, operator, and lift director.
Answer: C. Multiple cranes and one or more signal persons may share a dedicated channel to coordinate operations, or when coordinating with trains near railroad tracks. 1926.1420(b) requires a dedicated channel except for coordinating multiple cranes/signal persons or coordinating with other equipment or trains on or adjacent to railroad tracks.
Answer: C. One-half the length of the eye. For wire rope slings, the object in the eye must not exceed half the eye length to avoid spreading and damaging the eye.
Answer: D. To prevent point loading of the hook. Centering the load in the hook's bowl prevents point loading, which can overload and deform the hook.
Answer: A. Their use is prohibited — only slings made from new rope may be used. Only fiber rope slings made from new rope may be used; repaired or reconditioned fiber rope slings are prohibited.
Answer: C. The chain is alloy, but not necessarily suitable for overhead lifting. "A" means alloy only; without an accompanying 8 the chain is likely a lower grade (usually grade 6) and not suitable for overhead lifting.
Answer: B. The ratio of a component's minimum breaking strength to its working load limit. Design factor = minimum breaking strength ÷ WLL. For example, most slings use a 5:1 design factor, so a sling with 25,000 lb breaking strength has a 5,000 lb WLL.
Answer: D. Four. Synthetic fiber rope eye splices require at least four full tucks (manila requires three); short splices require eight and six full tucks respectively.
Answer: B. removed from service. Knots in any part of the sling are a listed removal criterion for synthetic webbing slings, along with burns, melting, cuts, broken stitching, and chemical or UV damage.
Answer: B. About 75 percent for a hitch and about 85 percent for a splice. Straight rope is 100 percent. A splice costs about 15 percent, a hitch about 25 percent, and a knot or bend about 50 percent — always rate the system at its weakest point.
Answer: B. 6 random broken wires in one lay, or 3 in one strand. Running rope removal is 6 randomly distributed broken wires in one lay or 3 in one strand; a wire rope sling uses 10 in one lay or 5 in one strand, so the criteria must not be confused.
Answer: C. They shall be replaced, not repaired. Para. 9-1.9.6(e): cracked, broken, stretched, bent, or twisted chain links shall not be repaired; they shall be replaced.
Answer: D. The point at which the object will balance, where the entire weight may be considered concentrated. The center of gravity is the balance point of the object; the entire weight may be considered as concentrated at this point.
Answer: C. lower the load to the ground. An unbalanced load must be set back down and the rigging adjusted; continuing the lift risks the load shifting or slipping out of the slings.
Your result
FAQ
25 questions
The mixed mobile crane test.
Take the 25-question test75 questions
One written exam for boom truck, lattice boom and telescopic boom.
Mobile crane practice test75 questions
Its own written exam, including self-erecting tower cranes.
Tower crane practice test75 questions
Its own written exam for overhead crane operators.
Overhead crane practice test5,000+ questions, lessons and a readiness score. Free to start.